Professionals’ Impressions Regarding the Saudi Arabian Procurement and Contracts System

Ahmed Alofi, Jacob Kashiwagi, Dean Kashiwagi

Abstract


Saudi Arabia (SA) has the largest construction market in the Middle East. However, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction. The system has been identified as a major risk to the SA government due to consistent increased costs and delays of up to 70% on projects. A survey was conducted with 1396 participants including engineers, buyers, contractors, consultants, academics, and architects. The purpose of the survey was to identify the validity of the recent claims that the procurement system in SA is broken. The participants work in both the private and government sectors. The survey results showed that the procurement system is a major risk to projects, affects construction projects negatively, and is in need of improvement.


References


Al Turkey. (2011). The reality of projects in terms of organization and structure, and the reasons for success and failure In Saudi Arabia. Alwatan Newspaper. [Online] accessed on 12 March 2015 available from http://www.alwatan.com.sa/Local/News_Detail.aspx?ArticleID=49126&CategoryID=5.

Al-Abidien, Z. HM (1983), About the effect of delay penalty on the construction of projects and modification proposal. Albogamy, A., Scott, D., & Dawood, N. (2012). Addressing Construction Delays in the Kingdom of Saudi Arabia. International Proceedings.

Al-Barak, A. A. (1993). Causes of contractors’ failures in Saudi Arabia. Master of Science thesis, KFUPM, Dhahran, Saudi Arabia.

Albogamy, A., Scott, D., & Dawood, N. (2012). Addressing Construction Delays in the Kingdom of Saudi Arabia. International Proceedings of Economics Development & Research, 45.

Al-Ghafly, M. A. "Delays in Construction of Public Utility Projects in Saudi Arabia, KFUPM, Dhahran, Saudi Arabia." (1995).

Alofi, A. (2015). Upgrade the Saudi Arabian Procurement System Delivery Method (Doctoral dissertation, ARIZONA STATE UNIVERSITY).

Alofi, A. (2016). An Analysis of the Current Procurement System in Saudi Arabia. 52nd ASC Annual International Conference Proceedings, Copyright 2016 by the Associated Schools of Construction.

Alofi, A., Alhammadi, Y., Kashiwagi, D., Kashiwagi, J., & Sullivan, K. (2015). Upgrade the Saudi Arabian Procurement System Delivery Method. Journal for the Advancement of Performance Information & Value, 7(1).

Alofi, A., Kashiwagi, J., & Kashiwagi, D. (2016). The Perception of the Government and Private Sectors on the Procurement System Delivery Method in Saudi Arabia. Procedia Engineering, 145, 1394-1401.

Al-Sultan, A. S. (1987). Determination of construction contract duration for public projects in Saudi Arabia (Doctoral dissertation, Master thesis, KFUPM, Dhahran, Saudi Arabia).

Altolany, S. (2013, October 27). Contractors are demanding the development of government procurement and contracting systems. Retrieved December 31, 2015, from http://www.alyaum.com/article/3100418.

Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International journal of project management, 24(4), 349-357.

Kashiwagi, D. (2014). 2014 best value stander Mesa, Arizona: Kashiwagi Solution Model (KSM).

Kashiwagi, D. (2014). 2014 information measurement theory with the "Kashiwagi Story'' Mesa, Arizona: Kashiwagi Solution Model (KSM).

Langdon, D. (2012). World Construction 2012. An AECOM Company. Najdeno, 30.

Performance Based Studies Research Group. (2014). Retrieved June 11, 2015, from http://pbsrg.com/.

Performance Based Studies Research Group. (2016). Unpublished Raw Data.


Full Text: PDF

Refbacks

  • There are currently no refbacks.