Identifying the Global Performance of the Construction Industry

Alfredo Rivera, Nguyen Le, Jacob Kashiwagi, Dean Kashiwagi

Abstract


This paper presents a literature research assessing the performance and issues of delivering construction services worldwide, by exploring reasons for delays and increased construction costs. The study shows a comparison of the performance of the construction industry between different continents and countries. Multiple research databases were looked through and performance information was taken from over 95 publications. The results reveal that although the construction industry is growing throughout the world, there are many of the same problems being experienced in delivering construction projects in developing countries and developed countries. The literature reveals that all countries and continents are experiencing the same issues. On average, 72% of projects are delayed with 38% increase in original contracted duration, also, 63% of projects experienced cost overruns with 24% increase in original contracted cost. Additionally, rework is also a factor that affects performance and accounts for 6% increase in total project costs. Customer satisfaction on projects is low, and 90% of all major issues causing non-performance are due to people. A best value approach was identified as a potential solution to overcome the poor performance on construction projects with the following results: tested over 1900 times, totaling over $6B of procured services, a 94% on time and 97% on budget, and 98% customer satisfaction.


References


Ashford, J. L. (1992). The management of quality in construction. E&F Spon, London.

Cheng, J., Proverbs, D. G., & Oduoza, C. F. (2006). The satisfaction levels of UK construction clients based on the performance of consultants: Results of a case study. Engineering, Construction and Architectural Management, 13(6), 567-583.

CII. (2015). CII 25 – Building on 25 Years. Construction Industry Institute. Web. (2 October 2015). Retrieved from https://www.construction-institute.org/scriptcontent/more/cii_25_more.cfm.

CII. (2015). Performance Assessment 2015 Edition. Construction Industry Institute. Web. (2015). Retrieved from http://www. Construction-institute.org/performance.

CIMA. (2013). 15 of the world’s biggest cost overrun projects. Financial Management. Chartered Institute of Management Accountants. Web (15 October 2015). Retrieved from http://www.fm-magazine.com/infographic/prime-number/15-world%E2%80%99s-biggest-cost-overrun-projects.

Duren, J. and Doree, A. (2008) An evaluation of Performance Information Procurement System

(PIPS), 3rd international public procurement conference proceedings 28(30) pp 923-946.

Egbu, C., Carey, B., Sullivan, K & Kashiwagi, D. (2008), Identification of the Use and Impact of Performance Information Within the Construction Industry Rep, The International Council for Research and Innovation in Building and Construction, AZ.

Flyvbjerg, B., Skamris Holm, M. K., & Buhl, S. L. (2003). How common and how large are cost overruns in transport infrastructure projects?. Transport reviews, 23(1), 71-88.

Goff, S. (2014). “IPMA Education and Training Board Series: Closing the Gap between PM Training and PM Performance: Part 2: Closing the Gap.” PM World Journal, Vol 3(7).

Kashiwagi, D. (1991). Development of a Performance Based Design/Procurement System for Nonstructural Facility System. Dissertation in Partial Fulfillment of the Requirements for the Degree Doctor of Philosophy, Arizona State University.

Kashiwagi, D.T. and Mayo, R.E. (2001) "Procurement of Construction in the 21st Century" COBRA 2001, Vol. 2; Glasgow University with the RICS Research Foundation, Glasgow, Scotland, Vol. 2, pp. 535-545 (September 5, 2001).

Kashiwagi, D. T. and Byfield, R. (2002) “Testing of Minimization of "Subjectivity" in Best Value Procurement by Using Artificial Intelligence Systems in the State of Utah Procurement.” ASCE: Journal of Construction Engineering and Management, 128 (6) pp.496-50.

Kashiwagi, D.T., Savicky, J. and Parmar, D. (2003) "Case Study of the University of Hawaii Implementation of Performance Based Procurement" Joint International Symposium of CIB Working Commissions: W55 Building Economics, W65 Organization & Management of Construction, W107 Construction in Developing Countries; Singapore, Vol. 1, pp.395-402 (October 22, 2003).

Kashiwagi, D.T. and Slater, C. (2003b) "Impact of Information Concepts on Construction Performance" ASCE 2003 Construction Research Congress, Honolulu, HI; CD-T1-2 (March 19, 2003).

Kashiwagi, D.T., Tang, Z. and Sullivan, K. (2006) "Potential Best Value Construction In China" International Conference in the Built Environment in the 21 st Century (ICiBE 2006) Kuala Lumpur, Malaysia, pp. 421-430 (June 13, 2006).

Kashiwagi, J., Smithwick, J., Sullivan, K. and Kashiwagi, D. (2009) "Neogard: The History and Formation of a Best Value Manufacturer" 2nd Construction Industry Research Achievement International Conference, Kuala Lumpur, Malaysia, CD-Day 2, Session E-5 (November 3-5, 2009).

Kashiwagi, D., Savicky, J., and Sullivan, K. (2010) “Strategic Plan for the Implementation of a New PM Model.” Fifth Scientific Conference on Project Management (PM-05) - Advancing Project Management for the 21st Century, Concepts, Tools & Techniques for Managing Successful Projects, Heraklion, Crete, Greece, pp. (May 29-31, 2010).

Kashiwagi, J. (2013). Dissertation. “Factors of Success in Performance Information Procurement System / Performance Information Risk Management System.” Delft University, Netherlands.

Kashiwagi, D. and Kashiwagi, I. (2014). The Best Value IT Industry. CIB: International Council for Research and Innovation in Building and Construction. The Journal for the Advancement of Performance Information and Value. Vol. 6. No. 1.

KPMG. (2015). Global Construction Survey 2015.KPMG International. Web (14 October 2015). Retrieved from https://www.kpmg.com/BR/PT/Estudos_Analises/artigosepublicacoes/-Documents/Build-Construction/global-construction-survey-2015.pdf.

Lepatner, B.B. (2007), Broken Buildings, Busted Budgets, The University of Chicago Press, Chicago.

Liu, J., Geng, L., & Bridge, A. (2016). "Never let a good crisis go to waste": Exploring the effects of psychological distance of project failure on learning intention. Journal of Management in Engineering. Retrieved October 20, 2016.

Love, P. E., & Li, H. (2000). Quantifying the causes and costs of rework in construction. Construction Management & Economics, 18(4), 479-490.

Memon, A., Rahman, I., & Azis, A. (2012). Time and Cost Performance in Construction Projects in Southern and Central Regions of Peninsular Malaysia. International Journal of Advances in Applied Sciences.

Moore, P. (2012). Contractors Confront the Growing Costs of Rework. Engineering News-Record (ENR.com). Web. (15 October 2015). Retrieved from http://enr.construction.com/business_management/project_delivery/2012/1203-contractors-confront-the-growing-costs-of-rework.asp.

Pew Research Center. (n.d.). Retrieved October 20, 2016, from http://search.pewresearch.org.

PBSRG. (2016). Performance Based Studies Research Group Internal Research Documentation, Arizona State University, Unpublished Raw Data.

Rivera, A. (2014). Impact of a Non-Traditional Research Approach Case Study on the Performance Based Studies Research Group (PBSRG) (Doctoral dissertation, ARIZONA STATE UNIVERSITY).

State of Hawaii PIPS Advisory Committee 2002, Report for Senate Concurrent Resolution No. 39 Requesting a Review of the Performance Information Procurement System (PIPS), Honolulu, HI: U.S. Government, Available from: http://hawaii.gov/dags/rpts/pips.pdf.

van de Rijt, J. and Witteveen, W. (2011). Contractor selection using BVP in the construction industry Case studies at the Dutch Ministry of Infrastructure, Ipsera Conference Proceedings Maastricht, 1398-1404.


Full Text: PDF

Refbacks

  • There are currently no refbacks.